Net Metering in Pakistan (2026 Guide): NEPRA Rules, DISCO NOC Process & Payback
Complete step-by-step breakdown of NEPRA Net Metering regulations in Pakistan. Learn the 5-stage DISCO NOC approval process (LESCO, IESCO, FESCO, PESCO, MEPCO), green bi-directional meter installation, and unit credit settlement.
Understanding Net Metering Under NEPRA Regulations
Net Metering in Pakistan is a billing mechanism governed by the National Electric Power Regulatory Authority (NEPRA) under the Alternative & Renewable Energy Distributed Generation and Net Metering Regulations. It allows residential, commercial, industrial, and agricultural electricity consumers who generate their own electricity using solar photovoltaic (PV) systems to export excess units back to the national grid.
Key Net Metering Fact for 2026:
Under the active NEPRA framework, excess electricity sent back to the utility grid (LESCO, IESCO, FESCO, PESCO, MEPCO, GEPCO, or K-Electric) is credited against the units consumed during peak and off-peak hours on your monthly electricity bill. Any surplus units at the end of the billing quarter are financially reimbursed or rolled over.
The 5-Stage DISCO NOC & Approval Process
Sultan Energy International handles the complete turnkey net metering process on behalf of our clients. Here is the verified 5-stage timeline from application submission to green meter turn-on:
Application Preparation & Preliminary Load Verification
Sultan Energy conducts a structural roof assessment and electrical load study. We prepare the consumer application including paid electricity bill copies, property ownership verification, CNIC, and single-line electrical engineering diagrams (SLD).
DISCO Site Inspection & NOC Issuance
The relevant distribution company (e.g. LESCO in Lahore, IESCO in Islamabad, FESCO in Faisalabad, PESCO in Peshawar) sends an engineering inspector to inspect the transformer capacity, phase balance, and anti-islanding safety features.
Distribution Generation Agreement (Schedule-I)
A formal bilateral 3-year renewable Net Metering Agreement is executed between the consumer and the utility DISCO. System capacity (kW), inverter model, and serial numbers are registered.
NEPRA Generation License Generation
NEPRA reviews the Schedule-I agreement and issues an official Distributed Generation License registered under the consumer's reference number.
Green Bi-Directional Meter Installation & Commissioning
The old unidirectional electricity meter is replaced with an authorized bi-directional green meter (accurate Class 1.0 or Class 0.5 metering). The solar system is energized and exports live green electricity into the grid.
Required Documents for Fast-Track Net Metering in Pakistan
- Copy of latest paid electricity bill (with matching name/address).
- Valid CNIC copy of the property owner / consumer.
- Copy of property ownership document (Registry, Fard, Allotment Letter, or Sale Deed).
- Single-Line Diagram (SLD) stamped by an authorized PEC Professional Engineer (provided by Sultan Energy).
- Inverter Type-Test Certificate proving compliance with IEC 62109-1/2 and IEC 61727/62116 anti-islanding.
- Tier-1 Solar Module Flash Test Reports & IEC certification (provided by Sultan Energy).
Financial Payback & Unit Economics
In Pakistan, grid electricity tariffs now exceed PKR 65 to PKR 75 per unit once Fuel Price Adjustments (FPA), quarterly tariff adjustments (QTA), electricity duty, sales tax, and surcharges are factored in. Because a 10 kW solar system produces approximately 1,200 to 1,400 units per month, homeowners routinely save PKR 75,000 to PKR 100,000+ per month, securing complete payback in under 3 years.
Ready to Calculate Solar Savings for Your Premises?
Get a comprehensive engineering proposal, shading simulation, and fast-track Net Metering NOC assistance from Sultan Energy International.