5 Active Engineering Hubs: Lahore (HQ) · Islamabad · Faisalabad · Talagang · CSD Peshawar
COMPLETE TURNKEY PACKAGES

Engineered Solar Packages.
Guaranteed Bill Reduction.

Complete residential, commercial and industrial solar packages with Tier-1 panels, certified inverters, galvanized mounting structures, and fast-track Net Metering.

⚡ DAILY SOLAR RATES Turnkey Solar Systems in Pakistan · On-Grid & Hybrid

Engineered complete solar systems featuring Tier-1 N-type panels, certified inverters, galvanized elevated structures, and LESCO / IESCO / MEPCO Net-Metering approvals. Ask about CSD easy installments for Pakistan Army personnel.

SYSTEM SIZES

Select Your Solar Capacity

All packages include high-efficiency Tier-1 panels, certified inverters, complete BOS wiring, protection breakers, and engineering execution.

RESIDENTIAL · 5 TO 10 MARLA
5 kW
Ideal for 5 to 10 Marla homes with 1 Inverter AC and essential home appliances.
  • 9 × 580W Tier-1 N-Type TOPCon Panels
  • 5kW Hybrid or On-Grid Inverter
  • Monthly Units: 550 – 650 units/month
  • Runs: 1 AC (1.5 Ton) + Refrigerator + Fans + LED Lights
  • Optional Battery: 5.12 kWh LiFePO4 for night backup
  • Net-Metering eligible for single or three-phase
PRICE ON REQUEST Wholesale & Project Rates
LARGE RESIDENCE · 1 TO 2 KANAL
15 kW
Designed for large homes, multi-story villas, and commercial offices with high summertime air-conditioning loads.
  • 26 × 580W Tier-1 TOPCon Dual Glass Panels
  • 15kW Three-Phase European Inverter (Huawei / GoodWe / Solis)
  • Monthly Units: 1,750 – 2,100 units/month
  • Runs: 4 – 5 Inverter ACs + Deep Freezers + Complete House
  • Heavy-duty GI Elevated Custom Structure (L2 / L3)
  • Turnkey Net-Metering inspection & commissioning
PRICE ON REQUEST Wholesale & Project Rates
COMMERCIAL & CLINICS
20 – 25 kW
For commercial buildings, private clinics, schools, corporate offices, and retail showrooms.
  • 36 to 44 × 580W Tier-1 Panels (up to 25kWp DC capacity)
  • 20kW or 25kW 3-Phase Inverter with Dual/Triple MPPTs
  • Monthly Units: 2,400 – 3,200 units/month
  • Significant reduction in commercial peak tariff electricity bills
  • Surge protection, DC disconnects & industrial switchgear
  • Complete DISCO NOC file processing
PRICE ON REQUEST Wholesale & Project Rates
INDUSTRIAL & WAREHOUSES
30 – 50 kW
Designed for manufacturing units, cold storages, textile units, and flour mills with heavy daytime motors.
  • 50kWp+ DC Solar Array with Trina / Canadian Solar modules
  • Sungrow / Huawei 33kW to 50kW C&I string inverters
  • Monthly Units: 3,800 – 6,500 units/month
  • Zero-export / dynamic power control or full Net-Metering
  • Custom industrial tin-shed or ground-mount civil structure
  • Engineering simulation, shadow analysis & ROI report
PRICE ON REQUEST Wholesale & Project Rates
EPC MEGAWATT & CSD CANOPIES
100+ kW
Proven institutional solar expertise, including the landmark 450 kW CSD Cavalry Ground Lahore rooftop & canopy project.
  • Custom engineered multi-hundred kW rooftop or solar canopy
  • Multi-inverter synchronization with HV transformer step-up
  • Monthly Units: 12,000 to 60,000+ units/month
  • Dual-purpose solar parking canopies providing shaded parking
  • Full EPC: civil foundation, structural fabrication, testing
  • Dedicated post-commissioning O&M team
PRICE ON REQUEST Wholesale & Project Rates
INTERACTIVE SOLAR ROI & PAYBACK ESTIMATOR

Calculate Your Solar System Size, Monthly Savings & Payback in Pakistan

Estimate how much money you will save every month under current NEPRA electricity tariffs, determine your recommended solar capacity, and calculate your exact capital payback period.

📊 ESTIMATED SOLAR PERFORMANCE
Recommended Solar Capacity 10 kW Approx. 16× 620W N-Type TOPCon Panels
Monthly Units Generated 1,300 kWh
Estimated Monthly Savings PKR 71,500
Estimated Annual Savings PKR 858,000
Capital Payback Period 2.7 Years
25-Year Lifetime Savings PKR 21.4 Million
Annual CO2 Offset 12.8 Tons / Yr
Inquire This System for Better Prices *Estimates based on average solar irradiance in Pakistan and current NEPRA multi-slab residential/commercial tariffs including taxes and fuel adjustments.
FAST-TRACK NOC PROCESS

5-Step DISCO Net Metering Approval Roadmap (LESCO, IESCO, FESCO, PESCO, MEPCO)

Sultan Energy International eliminates bureaucratic hurdles by managing the complete end-to-end net metering application, load flow studies, and green bi-directional meter installation.

1

Site Audit & Load Sizing

Roof structural assessment, shadow modeling, and single-line diagram (SLD) preparation stamped by a certified PEC engineer.

Day 1 – 3
2

DISCO File Submission

Submission of consumer documents, paid bills, ownership records, and inverter test certificates to your local DISCO sub-division.

Day 4 – 10
3

DISCO Site Inspection & NOC

Sub-divisional officer inspects transformer load capacity, phase balancing, and anti-islanding safety disconnects.

Day 11 – 20
4

Schedule-I & NEPRA License

Signing of the bilateral Distributed Generation Agreement and issuance of official NEPRA Distributed Generation License.

Day 21 – 35
5

Green Meter Energization

Installation of bi-directional green meter, test energization, and activation of export billing on your monthly utility bill.

Day 36 – 45
STRATEGIC PARTNER OF CSD

Solar Systems on Easy Installments
for Pakistan Armed Forces.

Through Sultan Energy International's strategic partnership with CSD (Canteen Stores Department), serving and retired Pakistan Army, Navy, and Air Force personnel can finance complete solar setups on easy monthly installments.

پاکستان آرمی کے حاضر اور ریٹائرڈ افسران اور جوانوں کے لیے آسان اقساط پر مکمل سولر سسٹم

Learn About CSD Installments ↗
INSTITUTIONAL EPC DELIVERY 450 kW

CSD Cavalry Ground, Lahore

Rooftop solar panels and a massive solar parking canopy covering 100+ vehicles delivered by Sultan Energy.

View CSD Case Study →
LET'S TALK SOLAR · THE BEST SOLAR COMPANY IN PAKISTAN

Unsure which capacity is best for your home or business?

Share your average monthly units consumed in peak summer (June/July) and your city. Sultan Energy will provide an exact calculation.

Start your enquiry ↗
WhatsApp us